Famous Tea Processing Unit Installation Precautions

1. Install the unit according to the tea making process. New factory buildings should take into account the number of mechanical units, operating space, and leaf area. The general production line of the machine is placed horizontally in a horizontal direction. 2. Select the knife and wire diameter according to the dynamic load of the processing machine. The aisle line should take protective measures. Each item on the switchboard should be installed to prevent missing items. 3. Pay attention to the direction of movement of the machine. If the direction is opposite to the specified direction, any two of the three items can be changed. 4. The flue pipe should be installed at a prescribed height, avoid turning 90 degrees, so as not to affect the mechanical combustion performance.

Solo Black Garlic (6 pcs)

Healthy Food,Cheap Gift Boxes,Joke Gift Boxes

Wanhe Food Co., Ltd. , http://www.hbblackgarlic.com

Posted on