Hand-seated transplanter installation and start

In order to be able to use the rice transplanter correctly in order to achieve stable production and high yield, it is necessary to correctly grasp the operation and use of the rice transplanter. First you need to open the random box and verify the accessories according to the list of parts inside. Among them, the middle benchmark and the preparation of the seedling tray are required for your own installation. Below, we will introduce you to the installation method.

The first thing to do is to find the center bar, which can be fixed directly to the front of the machine. Then begin to assemble the preparatory seedlings. The first step: the spring is assembled on the guide rod in the correct direction. Afterwards, the guide rod is fixed on the seedling tray bracket; the second step is to fix the front roller of the seedling tray frame, and then when loosening the seedling tray frame to the transplanter, loosen the bracket fixing plate on the guide rod and put the two The rear roller is mounted on a bracket guide. Next, the seedling tray is placed on the holder guide, the holder fixing plate is fixed, and the last two front rollers are installed. In this way, the seedling trays are assembled, and after doing a good job, do not forget to use your hands to check if the assembly is in place. Your machine is now a complete machine.

Let's take a look at how to operate this transplanter. Before starting the machine, check whether the engine oil and fuel are sufficient. If there is not enough, we must make up. Then open the fuel tank cap, add the appropriate amount of pure gasoline, there must be no open flame when refueling, put the fuel switch in the open position.

You are now ready to start the rice transplanter. Place the shift lever in neutral and start the switch to the operating position. If it is night, place it in the lighting position. Then gently pull out the throttle handle. The main clutch and the rice transplanter clutch are moved to the "off" position and the oil pressure handle is in the "down" position. And adjust the throttle handle to the inside 1/2. Then, pull the recoil starter, start the engine and push the damper back. Raise the machine, set the shift lever to the walking or planting gear, slowly connect the main clutch, and the machine can walk. When walking in Daejeon, in order to prevent bumps, you can put the gearshift lever in the plug and slowly transfer the machine.

Goggle

Goggle,Breathable Safety Goggle,,Protective Disposable Goggle

Dongguan Keyutai Mask Co., Ltd. , https://www.maskkytai.com

Posted on