Automotive electronic balance construction basics

Electronic crane scale explosion-proof electronic scales Shanghai truck scales scales stainless steel waterproof scale

The basic structure of SCS series car electronic scale is divided into shallow foundation pit and no foundation pit. Our company provides design drawings for users according to user needs.

Automotive electronic balance foundation construction requirements
1. The basic structure of SCS series car electronic scale is divided into shallow foundation pit and no foundation pit. Our company provides design drawings for users according to user needs.
2. The user designs the construction drawings according to the basic design drawings provided, combined with the geological conditions on site. Special attention must be paid to three issues in the construction design:
(1) The basic soil bearing capacity (ground endurance) is not less than 20t/m2. If the site geological conditions do not meet this requirement, reinforcement must be done.
(2) Foundation excavation must be dug below the local frozen soil line.
(3) For shallow foundation pit foundations, drainage channels must be designed. The foundation without foundation pits should also consider the surrounding drainage problem to ensure that the truck scale will not be flooded into the water due to rain.
3. The vertical and horizontal steel mesh in the foundation concrete should be bundled with 16# iron wire for more than 50% of the intersection, and connected to each iron base plate by steel bar (used as load cell ground wire).
4. The embedded parts (iron bottom plate, anchor bolts, angle iron retaining edges, etc.) in the foundation construction are provided by the user. Measures must be taken during construction to ensure the correct position of the anchor bolts and the iron floor. For this reason, it is recommended to use a secondary filling method to locate, and it is necessary to ensure that no voids are formed between the iron floor and the concrete. During construction, it is necessary to ensure that the level and elevation of each iron floor meet the requirements of the basic design drawings. The height difference of the center of each iron base plate should be less than 2mm, the horizontal inclination of the iron bottom plate should be less than 1/500, and the diagonal deviation of the center distance of each iron base plate should be less than 2mm.
5. After the foundation construction is completed, care must be taken. In order to shorten the construction period and curing time, measures such as “early strengthening agent” are added to the concrete during construction. The weighing platform shall not be installed when the concrete has not reached the design strength.
For more products , please visit our company owner :

We have not only conventional Honey but also Organic Honey, which have certified by BCS German. The main type is Organic Polyflora Honey, Organic Acacia Honey and Organic Vitex Honey, which come from the northeast of China and Northwest of China. We supply transaction issued by BCS GERMAN for each lot when export.

Organic Honey

Organic Polyflora Honey,Organic Acacia Honey,Organic Vitex Honey,Bee Honey,Vitex Honey

Easy Food (Jiaxing) Co., Ltd. , https://www.jxeasyfood.com

Posted on